I've run into an interesting scenario and I'm curious if anyone else has seen, or is seeing this same thing. I need to extract the summation of time from the Time Tracking Log field and use it in a formula field. Leaning on ye olde PowerPoint 🤪, I've compiled the scenarios I'm running into. Basically, the formula isn’t giving the expected output (except in the first scenario, which isn't very helpful).
Has anyone run into this or something similar?
I ran across two different posts that seem to touch on this (Get the time from [Time Tracking Log] in a Formula and Time tracking calculation problem). Vasken Bakalian I actually named this post similar to yours. Thanks for posting the formula field resolution. Any thoughts on this?
Also, Dan Leeman and Patrick Szydlik, would love your thoughts as well.
Thanks!
Chris